Above the roofs of Munich
Task:
Setting of a connecting passage
Execution:
For this project, a 8.5 tons heavy and 15 meters long connecting passage had to be delivered with the help of a heavy-duty transport into Volkartstraße.
A 200-tons crane lifted it up - over the roofs and between Rotkreuzklinikum München and the new medical specialist centre.
Extreme space constraints made the lifting difficult. For setting the connecting passage an additional loading crane was needed.
Equipment:
- Liebherr LTM 1200-5.1
- MAN TGX 33.540
- PK 50002-EH